TechCartaEvidence map

Browse · AI infrastructure power

Operating load

Power that large loads actually draw, as distinct from what they requested.

ValueAs ofSourceFilter, as publishedEvidenceCarta
5,778 MW 26 Mar 2026 Electric Reliability Council of Texas (ERCOT)
Grid operator (primary)
ERCOT slide "Large Load Interconnection Requests", chart "Actual and Projected Large Loads Growth 2022-2030", table row "Observed Energized", column 2026. This slide gives no definition; ERCOT's monthly status reports define it as all-time non-simultaneous peak consumption. Outdated as of 25 Apr 2026 CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-03-26-001
5,768 MW 13 Mar 2026 Electric Reliability Council of Texas (ERCOT)
Grid operator (primary)
ERCOT slide "Current Large Load Interconnection Queue", table row "Observed Energized", column 2026. ERCOT definition: "Projects that have received Approval to Energize from ERCOT Operations and are fully operational. Represented by all time non-simultaneous peak load consumption." Outdated as of 12 Apr 2026 CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-03-13-001
3,883 MW 13 Mar 2026 Electric Reliability Council of Texas (ERCOT)
Grid operator (primary)
ERCOT slide "Loads Approved to Energize – Observations 1", verbatim: "Of the 9042 MW that have received Approval to Energize, ERCOT has observed a non-simultaneous monthly peak consumption of 3883 MW in March 2025 which is a slight decrease since February 2025." Defined by ERCOT as "the sum of the maximum value for each individual load per month". Outdated as of 12 Apr 2026 CARTA-OPLOAD-ERCOT-PEAK_NONSIMULTANEOUS-2026-03-13-001
3,801 MW 13 Mar 2026 Electric Reliability Council of Texas (ERCOT)
Grid operator (primary)
ERCOT slide "Loads Approved to Energize – Observations 2", verbatim: "ERCOT has observed a simultaneous monthly peak consumption of 3801 MW in March 2025 which is a slight decrease since February 2025." Defined by ERCOT as "the maximum value of the sum of all the individual loads per month". Outdated as of 12 Apr 2026 CARTA-OPLOAD-ERCOT-PEAK_SIMULTANEOUS-2026-03-13-001
5,732 MW 25 Feb 2026 Electric Reliability Council of Texas (ERCOT)
Grid operator (primary)
ERCOT slide "Current Large Load Interconnection Queue", table row "Observed Energized", column 2026. ERCOT definition: "Projects that have received Approval to Energize from ERCOT Operations and are fully operational. Represented by all time non-simultaneous peak load consumption." Outdated as of 27 Mar 2026 CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-02-25-001
3,998 MW 25 Feb 2026 Electric Reliability Council of Texas (ERCOT)
Grid operator (primary)
ERCOT slide "Loads Approved to Energize – Observations 1", verbatim: "Of the 8876 MW that have received Approval to Energize, ERCOT has observed a non-simultaneous monthly peak consumption of 3998 MW in February 2025 which is a slight decrease since January 2025." Defined by ERCOT as "the sum of the maximum value for each individual load per month". Outdated as of 27 Mar 2026 CARTA-OPLOAD-ERCOT-PEAK_NONSIMULTANEOUS-2026-02-25-001
3,846 MW 25 Feb 2026 Electric Reliability Council of Texas (ERCOT)
Grid operator (primary)
ERCOT slide "Loads Approved to Energize – Observations 2", verbatim: "ERCOT has observed a simultaneous monthly peak consumption of 3846 MW in February 2025 which is a slight increase since January 2025." Defined by ERCOT as "the maximum value of the sum of all the individual loads per month". Outdated as of 27 Mar 2026 CARTA-OPLOAD-ERCOT-PEAK_SIMULTANEOUS-2026-02-25-001