Browse the map
Cartas are grouped by segment and topic. Each topic page lists every recorded claim in it, with filters for place, source and evidence.
AI infrastructure power
Electricity for data centers and the grid capacity, equipment and time it takes to deliver it.
- Large-load interconnection 11 Cartas Requests by data centers and other large loads to connect to the grid, and how far they get.
- Operating load 7 Cartas Power that large loads actually draw, as distinct from what they requested.
- Data-center electricity demand 37 Cartas How much electricity data centers use and are projected to use, and why estimates differ.
- Grid load forecasts 42 Cartas Grid operators' own forecasts of the load that data centers add.
- Interconnection timelines 0 Cartas How long each step from request to first power takes.
- Grid equipment 0 Cartas Lead times and prices for transformers, switchgear, turbines and other equipment.
- Generation queues 0 Cartas Context only. Requests to add generation, kept apart from load.
- Outlooks 0 Cartas TechCarta derivations from cited Cartas.