TechCartaEvidence map

AI infrastructure power · Operating load · CARTA-OPLOAD-ERCOT-PEAK_SIMULTANEOUS-2026-03-13-001

Observed large-load peak consumption

3,801MW

As of 13 Mar 2026 · Electric Reliability Council of Texas (ERCOT) · Outdated as of 12 Apr 2026 Permalink

Record

Filter, as published
ERCOT slide "Loads Approved to Energize – Observations 2", verbatim: "ERCOT has observed a simultaneous monthly peak consumption of 3801 MW in March 2025 which is a slight decrease since February 2025." Defined by ERCOT as "the maximum value of the sum of all the individual loads per month".
Category
AI infrastructure power · Operating load
Object
ercot_large_load_queue
Measure
Observed large-load peak consumption (funnel_metered_peak_mw)
Family
operating_load · load
Geography
ERCOT · US
Organization
ERCOT
Claim type
Official extract
Method
Text layer of slide 7, exact sentence match; no OCR. Raw sha256 e152e34d90e3. Verified against the source file on 2026-09-14 by TechCarta's automated checks: table values were read twice by OCR and matched, columns sum to their printed totals, and each value was compared with the slide image. Approved for publication by C.J. Fernandes.
Source
Electric Reliability Council of Texas (ERCOT), Large Load Interconnection Status Update
Grid operator (primary) · retrieved 14 Sep 2026
https://www.ercot.com/files/docs/2026/03/12/March-TAC-Report.pdf
Archived copy (identical file)
Evidence
Outdated as of 12 Apr 2026 Past its re-check date. Describes the evidence recorded for this claim, not whether it is true. How this is decided
Re-check after
12 Apr 2026 (30 days after the as-of date)
Notes
ERCOT's sentence names "March 2025" in a deck dated 2026-03-13. Recorded verbatim; the month may be a typo in the source.
License
cite_source

Related Cartas

Conflicts with

Cite this Carta

Plain text

Electric Reliability Council of Texas (ERCOT). (2026). Large Load Interconnection Status Update [Observed large-load peak consumption: 3,801 MW, as of 2026-03-13]. Retrieved 2026-09-14, from https://www.ercot.com/files/docs/2026/03/12/March-TAC-Report.pdf. Recorded in TechCarta, CARTA-OPLOAD-ERCOT-PEAK_SIMULTANEOUS-2026-03-13-001. https://techcarta.com/carta/CARTA-OPLOAD-ERCOT-PEAK_SIMULTANEOUS-2026-03-13-001/

BibTeX

@misc{carta_opload_ercot_peak_simultaneous_2026_03_13_001,
  author = {{Electric Reliability Council of Texas (ERCOT)}},
  title = {Large Load Interconnection Status Update: Observed large-load peak consumption, 3,801 MW (as of 2026-03-13)},
  year = {2026},
  howpublished = {\url{https://www.ercot.com/files/docs/2026/03/12/March-TAC-Report.pdf}},
  note = {TechCarta Carta CARTA-OPLOAD-ERCOT-PEAK_SIMULTANEOUS-2026-03-13-001; source retrieved 2026-09-14},
  url = {https://techcarta.com/carta/CARTA-OPLOAD-ERCOT-PEAK_SIMULTANEOUS-2026-03-13-001/}
}

This Carta is a TechCarta record, free to read and cite. Use of it requires citation. The underlying source belongs to its publisher.