AI infrastructure power · Large-load interconnection · CARTA-LOADQ-ERCOT-REQUESTED_MW-2026-02-25-001

Active large-load requested capacity

237,712MW

As of 25 Feb 2026 · Electric Reliability Council of Texas (ERCOT) · Outdated as of 27 Mar 2026 Permalink

Record

Filter, as published
ERCOT slide "Current Large Load Interconnection Queue", table row "Total (MW)", column 2030: cumulative actual and projected large load for 2022-2030, summed over statuses No Studies Submitted; Under ERCOT Review; Planning Studies Approved; Approved to Energize but Not Operational; Observed Energized.
Category
AI infrastructure power · Large-load interconnection
Object
ercot_large_load_queue
Measure
Active large-load requested capacity (load_queued_mw)
Family
large_load_queue · load
Geography
ERCOT · US
Organization
ERCOT
Claim type
Official extract
Method
OCR (RapidOCR) of the table on slide 3: 2 independent passes at different resolutions agree cell for cell, and in every column the status rows sum to Total (MW). Raw sha256 a4cc69d18ea1. Verified against the source file on 2026-09-14 by TechCarta's automated checks: table values were read twice by OCR and matched, columns sum to their printed totals, and each value was compared with the slide image. Approved for publication by C.J. Fernandes.
Source
Electric Reliability Council of Texas (ERCOT), Large Load Interconnection Status Update
Grid operator (primary) · retrieved 14 Sep 2026
https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf
Archived copy (identical file)
Evidence
Outdated as of 27 Mar 2026 Past its re-check date. Describes the evidence recorded for this claim, not whether it is true. How this is decided
Re-check after
27 Mar 2026 (30 days after the as-of date)
License
cite_source

Cite this Carta

Plain text

Electric Reliability Council of Texas (ERCOT). (2026). Large Load Interconnection Status Update [Active large-load requested capacity: 237,712 MW, as of 2026-02-25]. Retrieved 2026-09-14, from https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf. Recorded in TechCarta, CARTA-LOADQ-ERCOT-REQUESTED_MW-2026-02-25-001. https://techcarta.com/carta/CARTA-LOADQ-ERCOT-REQUESTED_MW-2026-02-25-001/

BibTeX

@misc{carta_loadq_ercot_requested_mw_2026_02_25_001,
  author = {{Electric Reliability Council of Texas (ERCOT)}},
  title = {Large Load Interconnection Status Update: Active large-load requested capacity, 237,712 MW (as of 2026-02-25)},
  year = {2026},
  howpublished = {\url{https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf}},
  note = {TechCarta Carta CARTA-LOADQ-ERCOT-REQUESTED_MW-2026-02-25-001; source retrieved 2026-09-14},
  url = {https://techcarta.com/carta/CARTA-LOADQ-ERCOT-REQUESTED_MW-2026-02-25-001/}
}

This Carta is a TechCarta record, free to read and cite. Use of it requires citation. The underlying source belongs to its publisher.