TechCartaEvidence map

AI infrastructure power · Large-load interconnection · CARTA-LOADQ-ERCOT-DC_MW-2026-03-13-001

Data-center identified MW

183,469MW

As of 13 Mar 2026 · Electric Reliability Council of Texas (ERCOT) · Outdated as of 12 Apr 2026 Permalink

Record

Filter, as published
ERCOT slide "Large Load Project Distribution by Type", pie chart label for category "Data Center" (share of tracked large load, with MW).
Category
AI infrastructure power · Large-load interconnection
Object
ercot_large_load_queue
Measure
Data-center identified MW (load_dc_mw)
Family
large_load_queue · load
Geography
ERCOT · US
Organization
ERCOT
Claim type
Official extract
Method
OCR (RapidOCR, 2 agreeing passes) of the chart label on slide 12. Raw sha256 e152e34d90e3. Verified against the source file on 2026-09-14 by TechCarta's automated checks: table values were read twice by OCR and matched, columns sum to their printed totals, and each value was compared with the slide image. Approved for publication by C.J. Fernandes.
Source
Electric Reliability Council of Texas (ERCOT), Large Load Interconnection Status Update
Grid operator (primary) · retrieved 14 Sep 2026
https://www.ercot.com/files/docs/2026/03/12/March-TAC-Report.pdf
Archived copy (identical file)
Evidence
Outdated as of 12 Apr 2026 Past its re-check date. Describes the evidence recorded for this claim, not whether it is true. How this is decided
Re-check after
12 Apr 2026 (30 days after the as-of date)
Notes
The label's share and MW imply a denominator of about 236,734 MW; the queue total on the same deck's table is 238,630 MW.
License
cite_source

Cite this Carta

Plain text

Electric Reliability Council of Texas (ERCOT). (2026). Large Load Interconnection Status Update [Data-center identified MW: 183,469 MW, as of 2026-03-13]. Retrieved 2026-09-14, from https://www.ercot.com/files/docs/2026/03/12/March-TAC-Report.pdf. Recorded in TechCarta, CARTA-LOADQ-ERCOT-DC_MW-2026-03-13-001. https://techcarta.com/carta/CARTA-LOADQ-ERCOT-DC_MW-2026-03-13-001/

BibTeX

@misc{carta_loadq_ercot_dc_mw_2026_03_13_001,
  author = {{Electric Reliability Council of Texas (ERCOT)}},
  title = {Large Load Interconnection Status Update: Data-center identified MW, 183,469 MW (as of 2026-03-13)},
  year = {2026},
  howpublished = {\url{https://www.ercot.com/files/docs/2026/03/12/March-TAC-Report.pdf}},
  note = {TechCarta Carta CARTA-LOADQ-ERCOT-DC_MW-2026-03-13-001; source retrieved 2026-09-14},
  url = {https://techcarta.com/carta/CARTA-LOADQ-ERCOT-DC_MW-2026-03-13-001/}
}

This Carta is a TechCarta record, free to read and cite. Use of it requires citation. The underlying source belongs to its publisher.