AI infrastructure power · Grid load forecasts · CARTA-LOADFC-PJM-METED_LLADJ_2031-2026-01-14-001
Large-load adjustment to forecast summer peak, METED, for 2031
75MW
As of 14 Jan 2026 · PJM Interconnection · Single source Permalink
Record
- Filter, as published
PJM "Table B-9b: Total Adjustments to Summer Peak Load (MW) for Each PJM Zone and RTO (2026 - 2046)", row "METED", column 2031. Summer peak load adjustments for large loads in PJM's 2026 load forecast.
- Category
- AI infrastructure power · Grid load forecasts
- Object
- pjm_summer_peak_load_forecast
- Measure
- Large-load adjustment to forecast summer peak (forecast_large_load_adjustment_mw)
- Family
- load_forecast · load
- Geography
- PJM · METED · US
- For year
- 2031
- Forecast vintage
- 2026 Load Forecast
- Organization
- PJM Interconnection
- Claim type
- Official extract
- Method
- Read from the published XLSX (no OCR), sheet 1. Checked: sub-areas sum to zones and zones sum to the PJM RTO row in every year. Raw sha256 ee3b682929db. Verified against the source file on 2026-09-14 by TechCarta's automated checks: each value was re-read from its cell in the published spreadsheet and matched, and zone rows sum to the RTO row. Approved for publication by C.J. Fernandes.
- Source
- PJM Interconnection, Table B-9b: Total Adjustments to Summer Peak Load (MW) for Each PJM Zone and RTO (2026 - 2046)
Grid operator (primary) · retrieved 14 Sep 2026
https://www.pjm.com/-/media/DotCom/planning/res-adeq/load-forecast/total-load-adjustments-breakdown.xlsx
Archived copy (identical file) - Evidence
- Single source Describes the evidence recorded for this claim, not whether it is true. How this is decided
- Re-check after
- 18 Feb 2027 (400 days after the as-of date)
- Notes
- PJM's 2026 Load Forecast Report (p. 4): "Near-term forecast years need 'firm' commitments, such as Electric Service Obligation (ESO)/Construction Commitments (CC), while longer-term projects will be considered 'non-firm' and will be derated."
- License
- cite_source
Cite this Carta
Plain text
PJM Interconnection. (2026). Table B-9b: Total Adjustments to Summer Peak Load (MW) for Each PJM Zone and RTO (2026 - 2046) [Large-load adjustment to forecast summer peak, METED, for 2031: 75 MW, as of 2026-01-14]. Retrieved 2026-09-14, from https://www.pjm.com/-/media/DotCom/planning/res-adeq/load-forecast/total-load-adjustments-breakdown.xlsx. Recorded in TechCarta, CARTA-LOADFC-PJM-METED_LLADJ_2031-2026-01-14-001. https://techcarta.com/carta/CARTA-LOADFC-PJM-METED_LLADJ_2031-2026-01-14-001/
BibTeX
@misc{carta_loadfc_pjm_meted_lladj_2031_2026_01_14_001,
author = {{PJM Interconnection}},
title = {Table B-9b: Total Adjustments to Summer Peak Load (MW) for Each PJM Zone and RTO (2026 - 2046): Large-load adjustment to forecast summer peak, METED, for 2031, 75 MW (as of 2026-01-14)},
year = {2026},
howpublished = {\url{https://www.pjm.com/-/media/DotCom/planning/res-adeq/load-forecast/total-load-adjustments-breakdown.xlsx}},
note = {TechCarta Carta CARTA-LOADFC-PJM-METED_LLADJ_2031-2026-01-14-001; source retrieved 2026-09-14},
url = {https://techcarta.com/carta/CARTA-LOADFC-PJM-METED_LLADJ_2031-2026-01-14-001/}
} This Carta is a TechCarta record, free to read and cite. Use of it requires citation. The underlying source belongs to its publisher.