TechCartaEvidence map

AI infrastructure power · Data-center electricity demand · CARTA-DEMAND-US-US_DC_TWH_2023-2025-04-07-001

Data-center electricity use, , for 2023

120–195TWh

As of 7 Apr 2025 · IEA Technology Collaboration Programme on Energy Efficient End-use Equipment (4E), EDNA · Corroborated Permalink

Record

Filter, as published
regional estimate for the US from the aggregation of regional and country-level studies
Category
AI infrastructure power · Data-center electricity demand
Object
us_data_centers
Measure
Data-center electricity use (dc_electricity_use_twh)
Family
demand_estimate · load
Geography
US
For year
2023
Organization
IEA 4E TCP, EDNA (authors George Kamiya and Vlad C. Coroamă)
Claim type
Estimate
Method
Transcribed by hand from the document (Executive Summary, PDF page 7). Raw sha256 0f80fd2fd0ec. Verified against the source file on 2026-09-14 by TechCarta's automated checks: each quote was found in the source file and each value in its quote. Approved for publication by C.J. Fernandes.
Source
IEA Technology Collaboration Programme on Energy Efficient End-use Equipment (4E), EDNA, Data Centre Energy Use: Critical Review of Models and Results
Intergovernmental agency · retrieved 14 Sep 2026
https://www.iea-4e.org/wp-content/uploads/2025/05/Data-Centre-Energy-Use-Critical-Review-of-Models-and-Results.pdf
Archived copy (identical file)
Evidence
Corroborated Describes the evidence recorded for this claim, not whether it is true. How this is decided
Re-check after
7 Apr 2027 (730 days after the as-of date)
Notes
Cryptocurrency mining is excluded from the analysis (PDF page 9).
License
cite_source

Cite this Carta

Plain text

IEA Technology Collaboration Programme on Energy Efficient End-use Equipment (4E), EDNA. (2025). Data Centre Energy Use: Critical Review of Models and Results [Data-center electricity use, None, for 2023: 120–195 TWh, as of 2025-04-07]. Retrieved 2026-09-14, from https://www.iea-4e.org/wp-content/uploads/2025/05/Data-Centre-Energy-Use-Critical-Review-of-Models-and-Results.pdf. Recorded in TechCarta, CARTA-DEMAND-US-US_DC_TWH_2023-2025-04-07-001. https://techcarta.com/carta/CARTA-DEMAND-US-US_DC_TWH_2023-2025-04-07-001/

BibTeX

@misc{carta_demand_us_us_dc_twh_2023_2025_04_07_001,
  author = {{IEA Technology Collaboration Programme on Energy Efficient End-use Equipment (4E), EDNA}},
  title = {Data Centre Energy Use: Critical Review of Models and Results: Data-center electricity use, None, for 2023, 120–195 TWh (as of 2025-04-07)},
  year = {2025},
  howpublished = {\url{https://www.iea-4e.org/wp-content/uploads/2025/05/Data-Centre-Energy-Use-Critical-Review-of-Models-and-Results.pdf}},
  note = {TechCarta Carta CARTA-DEMAND-US-US_DC_TWH_2023-2025-04-07-001; source retrieved 2026-09-14},
  url = {https://techcarta.com/carta/CARTA-DEMAND-US-US_DC_TWH_2023-2025-04-07-001/}
}

This Carta is a TechCarta record, free to read and cite. Use of it requires citation. The underlying source belongs to its publisher.