  "carta_id": "CARTA-OPLOAD-ERCOT-PEAK_SIMULTANEOUS-2026-02-25-001",
  "spec_version": "0.4.0",
  "family": "operating_load",
  "domain": "load",
  "object": "ercot_large_load_queue",
  "metric": "funnel_metered_peak_mw",
  "value_num": 3846,
  "unit": "MW",
  "as_of": "2026-02-25",
  "geo_iso_or_ba": "ERCOT",
  "geo_country": "US",
  "filter": "ERCOT slide \"Loads Approved to Energize – Observations 2\", verbatim: \"ERCOT has observed a simultaneous monthly peak consumption of 3846 MW in February 2025 which is a slight increase since January 2025.\" Defined by ERCOT as \"the maximum value of the sum of all the individual loads per month\".",
  "organization": "ERCOT",
  "claim_type": "official_extract",
  "method": "Text layer of slide 7, exact sentence match; no OCR. Raw sha256 a4cc69d18ea1. Verified against the source file on 2026-09-14 by TechCarta's automated checks: table values were read twice by OCR and matched, columns sum to their printed totals, and each value was compared with the slide image. Approved for publication by C.J. Fernandes.",
  "source_id": "ERCOT_LARGE_LOAD",
  "source_name": "Electric Reliability Council of Texas (ERCOT)",
  "source_document_title": "Large Load Interconnection Status Update",
  "source_url_or_id": "https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf",
  "source_retrieved_on": "2026-09-14",
  "source_class": "iso_primary",
  "source_sha256": "a4cc69d18ea10adf541dbecde28896daf1211fbb8701b2e974122916e66f4cb4",
  "source_archive_url": "https://web.archive.org/web/20260323202225/https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf",
  "source_archive_match": "exact",
  "topic": "operating_load",
  "stale_after_days": 30,
  "notes": "ERCOT's sentence names \"February 2025\" in a deck dated 2026-02-25. Recorded verbatim; the month may be a typo in the source.",
  "license": "cite_source",
  "is_example": false,
  "relations": {
    "conflicts": [
      {
        "id": "CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-02-25-001",
        "kind": "definition_drift"
      }
    ],
    "derived_from": [],
    "inputs_to": [],
    "supersedes": null,
    "superseded_by": null,
    "cites": [],
    "cited_by": []
  },
  "segment": "ai_infrastructure_power",
  "evidence_status_on_build_date": "outdated",
  "citation": {
    "plain": "Electric Reliability Council of Texas (ERCOT). (2026). Large Load Interconnection Status Update [Observed large-load peak consumption: 3,846 MW, as of 2026-02-25]. Retrieved 2026-09-14, from https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf. Recorded in TechCarta, CARTA-OPLOAD-ERCOT-PEAK_SIMULTANEOUS-2026-02-25-001. https://techcarta.com/carta/CARTA-OPLOAD-ERCOT-PEAK_SIMULTANEOUS-2026-02-25-001/",
    "bibtex": "@misc{carta_opload_ercot_peak_simultaneous_2026_02_25_001,\n  author = {{Electric Reliability Council of Texas (ERCOT)}},\n  title = {Large Load Interconnection Status Update: Observed large-load peak consumption, 3,846 MW (as of 2026-02-25)},\n  year = {2026},\n  howpublished = {\\url{https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf}},\n  note = {TechCarta Carta CARTA-OPLOAD-ERCOT-PEAK_SIMULTANEOUS-2026-02-25-001; source retrieved 2026-09-14},\n  url = {https://techcarta.com/carta/CARTA-OPLOAD-ERCOT-PEAK_SIMULTANEOUS-2026-02-25-001/}\n}"
  }
}