{
  "carta_id": "CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-03-26-001",
  "spec_version": "0.5.0",
  "family": "operating_load",
  "domain": "load",
  "object": "ercot_large_load_queue",
  "metric": "funnel_metered_peak_mw",
  "value_num": 5778,
  "unit": "MW",
  "as_of": "2026-03-26",
  "geo_iso_or_ba": "ERCOT",
  "geo_country": "US",
  "filter": "ERCOT slide \"Large Load Interconnection Requests\", chart \"Actual and Projected Large Loads Growth 2022-2030\", table row \"Observed Energized\", column 2026. This slide gives no definition; ERCOT's monthly status reports define it as all-time non-simultaneous peak consumption.",
  "organization": "ERCOT",
  "claim_type": "official_extract",
  "method": "OCR (RapidOCR) of the table on slide 3: 2 independent passes at different resolutions agree cell for cell, and in every column the status rows sum to Total (MW). Raw sha256 15ac8d6a3a8b. Verified against the source file on 2026-09-14 by TechCarta's automated checks: table values were read twice by OCR and matched, columns sum to their printed totals, and each value was compared with the slide image. Approved for publication by C.J. Fernandes.",
  "source_id": "ERCOT_LARGE_LOAD",
  "source_name": "Electric Reliability Council of Texas (ERCOT)",
  "source_document_title": "ERCOT Update to the Texas Legislature, Large Load Interconnection Requests",
  "source_url_or_id": "https://www.ercot.com/files/docs/2026/04/01/ERCOT_LargeLoad_Update_April2026_B-C_-Hearing.pdf",
  "source_retrieved_on": "2026-09-14",
  "source_class": "iso_primary",
  "source_sha256": "15ac8d6a3a8b99a1011c8be2e6254ccbdc66656745a787cc946f2b7c1382aa5d",
  "source_archive_url": "https://web.archive.org/web/20260607030544/https://www.ercot.com/files/docs/2026/04/01/ERCOT_LargeLoad_Update_April2026_B-C_-Hearing.pdf",
  "source_archive_match": "exact",
  "topic": "operating_load",
  "stale_after_days": 30,
  "license": "cite_source",
  "is_example": false,
  "relations": {
    "conflicts": [],
    "derived_from": [],
    "inputs_to": [],
    "supersedes": null,
    "superseded_by": null,
    "cites": [],
    "cited_by": []
  },
  "segment": "ai_infrastructure_power",
  "evidence_status_on_build_date": "outdated",
  "citation": {
    "plain": "Electric Reliability Council of Texas (ERCOT). (2026). ERCOT Update to the Texas Legislature, Large Load Interconnection Requests [Observed large-load peak consumption: 5,778 MW, as of 2026-03-26]. Retrieved 2026-09-14, from https://www.ercot.com/files/docs/2026/04/01/ERCOT_LargeLoad_Update_April2026_B-C_-Hearing.pdf. Recorded in TechCarta, CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-03-26-001. https://techcarta.com/carta/CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-03-26-001/",
    "bibtex": "@misc{carta_opload_ercot_observed_energized_2026_03_26_001,\n  author = {{Electric Reliability Council of Texas (ERCOT)}},\n  title = {ERCOT Update to the Texas Legislature, Large Load Interconnection Requests: Observed large-load peak consumption, 5,778 MW (as of 2026-03-26)},\n  year = {2026},\n  howpublished = {\\url{https://www.ercot.com/files/docs/2026/04/01/ERCOT_LargeLoad_Update_April2026_B-C_-Hearing.pdf}},\n  note = {TechCarta Carta CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-03-26-001; source retrieved 2026-09-14},\n  url = {https://techcarta.com/carta/CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-03-26-001/}\n}"
  }
}
