  "carta_id": "CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-02-25-001",
  "spec_version": "0.4.0",
  "family": "operating_load",
  "domain": "load",
  "object": "ercot_large_load_queue",
  "metric": "funnel_metered_peak_mw",
  "value_num": 5732,
  "unit": "MW",
  "as_of": "2026-02-25",
  "geo_iso_or_ba": "ERCOT",
  "geo_country": "US",
  "filter": "ERCOT slide \"Current Large Load Interconnection Queue\", table row \"Observed Energized\", column 2026. ERCOT definition: \"Projects that have received Approval to Energize from ERCOT Operations and are fully operational. Represented by all time non-simultaneous peak load consumption.\"",
  "organization": "ERCOT",
  "claim_type": "official_extract",
  "method": "OCR (RapidOCR) of the table on slide 3: 2 independent passes at different resolutions agree cell for cell, and in every column the status rows sum to Total (MW). Raw sha256 a4cc69d18ea1. Verified against the source file on 2026-09-14 by TechCarta's automated checks: table values were read twice by OCR and matched, columns sum to their printed totals, and each value was compared with the slide image. Approved for publication by C.J. Fernandes.",
  "source_id": "ERCOT_LARGE_LOAD",
  "source_name": "Electric Reliability Council of Texas (ERCOT)",
  "source_document_title": "Large Load Interconnection Status Update",
  "source_url_or_id": "https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf",
  "source_retrieved_on": "2026-09-14",
  "source_class": "iso_primary",
  "source_sha256": "a4cc69d18ea10adf541dbecde28896daf1211fbb8701b2e974122916e66f4cb4",
  "source_archive_url": "https://web.archive.org/web/20260323202225/https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf",
  "source_archive_match": "exact",
  "topic": "operating_load",
  "stale_after_days": 30,
  "license": "cite_source",
  "is_example": false,
  "relations": {
    "conflicts": [
      {
        "id": "CARTA-OPLOAD-ERCOT-PEAK_NONSIMULTANEOUS-2026-02-25-001",
        "kind": "definition_drift"
      },
      {
        "id": "CARTA-OPLOAD-ERCOT-PEAK_SIMULTANEOUS-2026-02-25-001",
        "kind": "definition_drift"
      }
    ],
    "derived_from": [],
    "inputs_to": [],
    "supersedes": null,
    "superseded_by": null,
    "cites": [],
    "cited_by": []
  },
  "segment": "ai_infrastructure_power",
  "evidence_status_on_build_date": "outdated",
  "citation": {
    "plain": "Electric Reliability Council of Texas (ERCOT). (2026). Large Load Interconnection Status Update [Observed large-load peak consumption: 5,732 MW, as of 2026-02-25]. Retrieved 2026-09-14, from https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf. Recorded in TechCarta, CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-02-25-001. https://techcarta.com/carta/CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-02-25-001/",
    "bibtex": "@misc{carta_opload_ercot_observed_energized_2026_02_25_001,\n  author = {{Electric Reliability Council of Texas (ERCOT)}},\n  title = {Large Load Interconnection Status Update: Observed large-load peak consumption, 5,732 MW (as of 2026-02-25)},\n  year = {2026},\n  howpublished = {\\url{https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf}},\n  note = {TechCarta Carta CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-02-25-001; source retrieved 2026-09-14},\n  url = {https://techcarta.com/carta/CARTA-OPLOAD-ERCOT-OBSERVED_ENERGIZED-2026-02-25-001/}\n}"
  }
}