  "carta_id": "CARTA-LOADQ-ERCOT-REQUESTED_MW-2026-03-13-001",
  "spec_version": "0.4.0",
  "family": "large_load_queue",
  "domain": "load",
  "object": "ercot_large_load_queue",
  "metric": "load_queued_mw",
  "value_num": 238630,
  "unit": "MW",
  "as_of": "2026-03-13",
  "geo_iso_or_ba": "ERCOT",
  "geo_country": "US",
  "filter": "ERCOT slide \"Current Large Load Interconnection Queue\", table row \"Total (MW)\", column 2030: cumulative actual and projected large load for 2022-2030, summed over statuses No Studies Submitted; Under ERCOT Review; Planning Studies Approved; Approved to Energize but Not Operational; Observed Energized.",
  "organization": "ERCOT",
  "claim_type": "official_extract",
  "method": "OCR (RapidOCR) of the table on slide 3: 2 independent passes at different resolutions agree cell for cell, and in every column the status rows sum to Total (MW). Raw sha256 e152e34d90e3. Verified against the source file on 2026-09-14 by TechCarta's automated checks: table values were read twice by OCR and matched, columns sum to their printed totals, and each value was compared with the slide image. Approved for publication by C.J. Fernandes.",
  "source_id": "ERCOT_LARGE_LOAD",
  "source_name": "Electric Reliability Council of Texas (ERCOT)",
  "source_document_title": "Large Load Interconnection Status Update",
  "source_url_or_id": "https://www.ercot.com/files/docs/2026/03/12/March-TAC-Report.pdf",
  "source_retrieved_on": "2026-09-14",
  "source_class": "iso_primary",
  "source_sha256": "e152e34d90e3cc0fa46f1bbda9d54fac78e8b7dc37a5901ee625ad0b7923dee1",
  "source_archive_url": "https://web.archive.org/web/20260702164630/https://www.ercot.com/files/docs/2026/03/12/March-TAC-Report.pdf",
  "source_archive_match": "exact",
  "topic": "large_load_interconnection",
  "stale_after_days": 30,
  "license": "cite_source",
  "is_example": false,
  "relations": {
    "conflicts": [],
    "derived_from": [],
    "inputs_to": [],
    "supersedes": null,
    "superseded_by": null,
    "cites": [],
    "cited_by": []
  },
  "segment": "ai_infrastructure_power",
  "evidence_status_on_build_date": "outdated",
  "citation": {
    "plain": "Electric Reliability Council of Texas (ERCOT). (2026). Large Load Interconnection Status Update [Active large-load requested capacity: 238,630 MW, as of 2026-03-13]. Retrieved 2026-09-14, from https://www.ercot.com/files/docs/2026/03/12/March-TAC-Report.pdf. Recorded in TechCarta, CARTA-LOADQ-ERCOT-REQUESTED_MW-2026-03-13-001. https://techcarta.com/carta/CARTA-LOADQ-ERCOT-REQUESTED_MW-2026-03-13-001/",
    "bibtex": "@misc{carta_loadq_ercot_requested_mw_2026_03_13_001,\n  author = {{Electric Reliability Council of Texas (ERCOT)}},\n  title = {Large Load Interconnection Status Update: Active large-load requested capacity, 238,630 MW (as of 2026-03-13)},\n  year = {2026},\n  howpublished = {\\url{https://www.ercot.com/files/docs/2026/03/12/March-TAC-Report.pdf}},\n  note = {TechCarta Carta CARTA-LOADQ-ERCOT-REQUESTED_MW-2026-03-13-001; source retrieved 2026-09-14},\n  url = {https://techcarta.com/carta/CARTA-LOADQ-ERCOT-REQUESTED_MW-2026-03-13-001/}\n}"
  }
}