  "carta_id": "CARTA-LOADQ-ERCOT-DC_SHARE-2026-02-25-001",
  "spec_version": "0.4.0",
  "family": "large_load_queue",
  "domain": "load",
  "object": "ercot_large_load_queue",
  "metric": "load_dc_share",
  "value_num": 74.4,
  "unit": "percent",
  "as_of": "2026-02-25",
  "geo_iso_or_ba": "ERCOT",
  "geo_country": "US",
  "filter": "ERCOT slide \"Large Load Project Distribution by Type\", pie chart label for category \"Data Center\" (share of tracked large load, with MW).",
  "organization": "ERCOT",
  "claim_type": "official_extract",
  "method": "OCR (RapidOCR, 2 agreeing passes) of the chart label on slide 12. Raw sha256 a4cc69d18ea1. Verified against the source file on 2026-09-14 by TechCarta's automated checks: table values were read twice by OCR and matched, columns sum to their printed totals, and each value was compared with the slide image. Approved for publication by C.J. Fernandes.",
  "source_id": "ERCOT_LARGE_LOAD",
  "source_name": "Electric Reliability Council of Texas (ERCOT)",
  "source_document_title": "Large Load Interconnection Status Update",
  "source_url_or_id": "https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf",
  "source_retrieved_on": "2026-09-14",
  "source_class": "iso_primary",
  "source_sha256": "a4cc69d18ea10adf541dbecde28896daf1211fbb8701b2e974122916e66f4cb4",
  "source_archive_url": "https://web.archive.org/web/20260323202225/https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf",
  "source_archive_match": "exact",
  "topic": "large_load_interconnection",
  "stale_after_days": 30,
  "notes": "The label's share and MW imply a denominator of about 235,382 MW; the queue total on the same deck's table is 237,712 MW.",
  "license": "cite_source",
  "is_example": false,
  "relations": {
    "conflicts": [],
    "derived_from": [],
    "inputs_to": [],
    "supersedes": null,
    "superseded_by": null,
    "cites": [],
    "cited_by": []
  },
  "segment": "ai_infrastructure_power",
  "evidence_status_on_build_date": "outdated",
  "citation": {
    "plain": "Electric Reliability Council of Texas (ERCOT). (2026). Large Load Interconnection Status Update [Data-center share of queued load: 74.4%, as of 2026-02-25]. Retrieved 2026-09-14, from https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf. Recorded in TechCarta, CARTA-LOADQ-ERCOT-DC_SHARE-2026-02-25-001. https://techcarta.com/carta/CARTA-LOADQ-ERCOT-DC_SHARE-2026-02-25-001/",
    "bibtex": "@misc{carta_loadq_ercot_dc_share_2026_02_25_001,\n  author = {{Electric Reliability Council of Texas (ERCOT)}},\n  title = {Large Load Interconnection Status Update: Data-center share of queued load, 74.4\\% (as of 2026-02-25)},\n  year = {2026},\n  howpublished = {\\url{https://www.ercot.com/files/docs/2026/03/05/February-TAC-Report.pdf}},\n  note = {TechCarta Carta CARTA-LOADQ-ERCOT-DC_SHARE-2026-02-25-001; source retrieved 2026-09-14},\n  url = {https://techcarta.com/carta/CARTA-LOADQ-ERCOT-DC_SHARE-2026-02-25-001/}\n}"
  }
}