  "carta_id": "CARTA-LOADFC-PJM-COMED_LLADJ_2046-2026-01-14-001",
  "spec_version": "0.4.0",
  "family": "load_forecast",
  "domain": "load",
  "object": "pjm_summer_peak_load_forecast",
  "metric": "forecast_large_load_adjustment_mw",
  "value_num": 10870.0,
  "unit": "MW",
  "as_of": "2026-01-14",
  "geo_iso_or_ba": "PJM",
  "geo_country": "US",
  "geo_subregion": "COMED",
  "filter": "PJM \"Table B-9b: Total Adjustments to Summer Peak Load (MW) for Each PJM Zone and RTO (2026 - 2046)\", row \"COMED\", column 2046. Summer peak load adjustments for large loads in PJM's 2026 load forecast.",
  "cohort": "2026 Load Forecast",
  "target_year": 2046,
  "organization": "PJM Interconnection",
  "claim_type": "official_extract",
  "method": "Read from the published XLSX (no OCR), sheet 1. Checked: sub-areas sum to zones and zones sum to the PJM RTO row in every year. Raw sha256 ee3b682929db. Verified against the source file on 2026-09-14 by TechCarta's automated checks: each value was re-read from its cell in the published spreadsheet and matched, and zone rows sum to the RTO row. Approved for publication by C.J. Fernandes.",
  "source_id": "PJM_LOAD_FORECAST",
  "source_name": "PJM Interconnection",
  "source_document_title": "Table B-9b: Total Adjustments to Summer Peak Load (MW) for Each PJM Zone and RTO (2026 - 2046)",
  "source_url_or_id": "https://www.pjm.com/-/media/DotCom/planning/res-adeq/load-forecast/total-load-adjustments-breakdown.xlsx",
  "source_retrieved_on": "2026-09-14",
  "source_class": "iso_primary",
  "source_sha256": "ee3b682929db0b59a043c8ab6d1c9776f697ab10fc86fe603a6d0d724893c4ba",
  "source_archive_url": "https://web.archive.org/web/20260703051445/https://www.pjm.com/-/media/DotCom/planning/res-adeq/load-forecast/total-load-adjustments-breakdown.xlsx",
  "source_archive_match": "exact",
  "topic": "load_forecasts",
  "stale_after_days": 400,
  "notes": "PJM's 2026 Load Forecast Report (p. 4): \"Near-term forecast years need 'firm' commitments, such as Electric Service Obligation (ESO)/Construction Commitments (CC), while longer-term projects will be considered 'non-firm' and will be derated.\"",
  "license": "cite_source",
  "is_example": false,
  "relations": {
    "conflicts": [],
    "derived_from": [],
    "inputs_to": [],
    "supersedes": null,
    "superseded_by": null,
    "cites": [],
    "cited_by": []
  },
  "segment": "ai_infrastructure_power",
  "evidence_status_on_build_date": "single_source",
  "citation": {
    "plain": "PJM Interconnection. (2026). Table B-9b: Total Adjustments to Summer Peak Load (MW) for Each PJM Zone and RTO (2026 - 2046) [Large-load adjustment to forecast summer peak, COMED, for 2046: 10,870 MW, as of 2026-01-14]. Retrieved 2026-09-14, from https://www.pjm.com/-/media/DotCom/planning/res-adeq/load-forecast/total-load-adjustments-breakdown.xlsx. Recorded in TechCarta, CARTA-LOADFC-PJM-COMED_LLADJ_2046-2026-01-14-001. https://techcarta.com/carta/CARTA-LOADFC-PJM-COMED_LLADJ_2046-2026-01-14-001/",
    "bibtex": "@misc{carta_loadfc_pjm_comed_lladj_2046_2026_01_14_001,\n  author = {{PJM Interconnection}},\n  title = {Table B-9b: Total Adjustments to Summer Peak Load (MW) for Each PJM Zone and RTO (2026 - 2046): Large-load adjustment to forecast summer peak, COMED, for 2046, 10,870 MW (as of 2026-01-14)},\n  year = {2026},\n  howpublished = {\\url{https://www.pjm.com/-/media/DotCom/planning/res-adeq/load-forecast/total-load-adjustments-breakdown.xlsx}},\n  note = {TechCarta Carta CARTA-LOADFC-PJM-COMED_LLADJ_2046-2026-01-14-001; source retrieved 2026-09-14},\n  url = {https://techcarta.com/carta/CARTA-LOADFC-PJM-COMED_LLADJ_2046-2026-01-14-001/}\n}"
  }
}